Aulander Holloman
Aulander, North CarolinaA 125 MWdc utility-scale solar project, with Fifth Third Bank contracting for 100% of the project’s output — making Fifth Third the first Fortune 500 company to offset its entire electricity load through a single solar project. SE1 delivered the project as EPC contractor.

Key Project Information
Operations
-
Location
Aulander, North Carolina
-
Capacity
125.0 MWDC / 100.0 MWAC (1.25x DC/AC)
-
COD
May 2019
-
Interconnection
Virginia Electric Power Company (PJM)
-
Energy Production
202.7 GWh (2021); 18.5% NCFDC
Commercial
-
PPA Offtake
Fifth Third Bank (100% output contracted)
-
Debt Financing
ING (project-level debt)
-
Tax Equity Financing
U.S. Bank (inverted lease)
Equipment
-
-
Project Design
Single-axis tracker
-
Module Manufacturer
Hanwha
-
Inverter Manufacturer
Huawei
-
Racking Manufacturer
ATI
-
EPC Provider
SunEnergy1
-
O&M Provider
SunEnergy1
-